OVERVIEW
Project Spotlight: Lake Ralph Hall Conveyance System
Location: Ladonia, TX
As one of the largest new reservoir projects in Texas in nearly 30 years, the Lake Ralph Hall Conveyance System represents a massive investment in water infrastructure for North Texas. Designed to deliver a reliable water supply for decades to come, the system required durable, high-performance building materials engineered for long-term performance.
Acudor was proud to play a role in this landmark project by supplying thermally enhanced aluminum roof hatches specifically designed to meet the site’s demanding requirements.
Custom-Engineered Roof Hatches
The hatches supplied for Lake Ralph Hall were manufactured to special sizes and feature a double-leaf construction with lift assistance, ensuring ease of operation even with large panel dimensions. Each unit is built with a 12-inch high insulated curb and 3-inch polyisocyanurate insulation (R-18 value) in both the curb and cover, delivering superior thermal performance while reducing energy loss.
Built for Efficiency and Reliability
A Partnership in Performance
By working closely with the project teams, Acudor delivered roof hatches that not only meet the project’s specifications but also ensure long-term durability and energy efficiency. This collaboration highlights Acudor’s ongoing commitment to supporting large-scale infrastructure projects with access solutions that perform under the most demanding conditions.
Need help on your next project?
Contact our team to discuss a custom-engineered access solution tailored to your specifications.
RHA Service Stair Access
Yokota Air Base, Japan
Case Study: NYC MTA Subway Station Escalator Upgrade
Luxury access to the roof terrace by LAMILUX roof access hatch